Well, actually this is Part 2, since I started on the coops two weeks ago. Anyway, with Katherine's help, the frame of the first one is finished. Problem is...it didn't work like it was supposed to!
For starters, it was supposed to be shaped something like this:
My cute as a button assistant...
You know, I can be rather goofy sometimes...
We had all but one hoop (there were supposed to be 5) together, when they started snapping! 1 inch 40 SD PVC pipe popping is rather startling. This was the result...
Sooo...we brain-stormed...I called Daddy...and this is what we ended up doing: We made a triangle out of the pipe (instead of arches). I drilled holes through the ends, stuck a nail through, and pounded it down.
I started by sawing off the one unbroken pipe.
Then I drilled holes in the top of the pipes...
(How'd you like those orange ear-plugs? )
Pounding away...(I had to have another pair of gloves held against the head of the nail to keep from hurting myself.)
Finished frame!
It wasn't that hot...I just thought this one was a cool picture! (I was still up the ladder when Katherine took it.)
Well, there you have it...we still have to finish...but that'll come in Part 2.